The contract was signed in 2017 with the contractor “J. & P. ABAX SA”
It included the installation of the primary irrigation network, i.e., the Drilling, the Reservoirs as well as the Pump Station of the primary network of pipes and pipelines with valves etc.
It was crowned with absolute success and in a shorter than the allotted timeframe for execution and delivery of the project.